Business Process Model & Notation (BPMN)
A plain-English guide to the standard shapes that map how work moves from a start to a finish.
In short
BPMN is a standard set of shapes for mapping how work moves from a start to a finish, using events, activities, gateways, arrows and lanes.
4 min readFree
What you will learn
This lesson explains a drawing system called BPMN. You will learn what it is, which shapes it uses, and how a designer can read or draw a simple process with it. You do not need any prior knowledge.
A process is a set of steps that turns a starting point into a result, such as placing an online order. A diagram is a picture that shows those steps and how they connect.
Key words
- BPMN
- Business Process Model and Notation. A shared set of shapes and rules for drawing business processes.
- Notation
- A fixed set of symbols, where each symbol has one agreed meaning.
- Process
- A series of steps that leads to a result.
- Diagram
- A drawing that shows the parts of something and how they link.
- Stakeholder
- Anyone who cares about or works on a process, such as a designer, a developer or a manager.
Where did BPMN come from?
BPMN began with the Business Process Management Initiative (BPMI), a group that wanted one common way to draw business processes. The Object Management Group (OMG), a standards group, has looked after BPMN since its merger with BPMI in 2005. In 2011, version 2.0 arrived and the name became Business Process Model and Notation.
The OMG calls version 2.0.2 the final formal version. BPMN is also an international standard, known as ISO/IEC 19510. It is a graphical notation, so its main job is to show a process as a picture that business users and technical staff can both read.
Tip
You may still see the older name, Business Process Modeling Notation. Both names describe the same BPMN acronym.
What are the four groups of shapes?
BPMN sorts its shapes into groups. Each group has one job. Here are the four main groups.
Flow objects
The main parts of a process: events, activities and gateways.
Connecting objects
The lines and arrows that link those parts together.
Swimlanes
Containers that show who does which work. A pool holds one participant, and a lane is a row inside a pool for one role.
Artifacts
Extra information such as data objects, groups and notes.
What are events and activities?
An event is drawn as a circle. An event is something that happens, such as a request arriving or a timer running out. An activity is drawn as a rounded rectangle. An activity is work that someone does, such as checking a form.
The border of the circle shows the event type. A start event has a thin border. An intermediate event, which happens in the middle of a process, has a double border. An end event has a thick border and marks the finish.
What are gateways?
A gateway is drawn as a diamond. A gateway is a point where the path splits or joins. The symbol inside the diamond tells you which kind of gateway it is.
Exclusive gateway
Shows an X inside. Only one path can be taken.
Parallel gateway
Shows a plus sign inside. All paths run at the same time, with no choice to make.
Inclusive gateway
Shows a circle inside. One or more paths can be taken.
What are arrows and lanes?
A sequence flow is a solid line with an arrow. It shows which step comes next inside one pool. A message flow is a dashed line. It carries a message from one pool to another, for example from a customer to a company. A message flow never links two steps that sit in the same pool.
How do you draw a simple process?
- 1
Mark the start
Place one start event at the left edge to show where the process begins.
- 2
List the work
Add an activity for each job, in the order the work happens.
- 3
Add a decision
Where the path must choose, add a gateway and label each path it creates.
- 4
Link the parts
Join the shapes with sequence flows, always pointing in the direction the work moves.
- 5
Mark the finish
Close each path with an end event.
Shapes as data
The sample below is not a real BPMN file. It is a small lookup table that matches each shape name to its look, so you can see the idea of one name and one meaning.
shapes = {
"start event": "circle, thin border",
"activity": "rounded rectangle",
"gateway": "diamond",
"end event": "circle, thick border",
}
for name, look in shapes.items():
print(f"{name}: {look}")
Output
start event: circle, thin border activity: rounded rectangle gateway: diamond end event: circle, thick border
Check yourself
Quick check
In BPMN, which gateway lets only one path be taken?
Why do designers use BPMN?
BPMN is built for business processes. It leaves out things such as organizational structures, functional breakdowns and data models, and it is not a data flow diagram.
BPMN diagrams are meant to be read by both business users and technical staff.
Tip
Sketch the process in plain boxes first. Switch to BPMN symbols when your team needs one precise, shared standard.
Sources
Last updated on 17 November 2026
Related lessons
Learn with me
Every lesson is free. I add new ones as I learn. Have a question, or want help with your own work? Book a short call.